Product introduction:
Operation method:
1. preparation work
(1) turn the high pressure twisting counter clockwise to zero position.
(2) work for the "crowding out" state, the breakdown to select button "no stop" position, the power switch on the "open" position, the power indicator light indicates a high voltage output, press the test button, the alarm lights, bell, lights out a continuous high voltage high voltage output. In the "rewinding" state, the reset button is selected as the "stop" position.
(3) working mode, the power on the "open" position the power indicator light, press the "high starting pressure" button, indicator light, said a high voltage output, press the "test" button, the alarm lights, the doorbell rang, high pressure indication lamp, high voltage output interrupt.
(4) open the cover of the power frequency spark test machine, press the "high voltage start" button, the high voltage indicator light is not bright, no high voltage output indicates that the self locking switch is working normally.
(5) if the above test function is normal, disconnect the power switch and be ready to be put into normal operation.
2. operating program
(1) open the cover of the power frequency spark test machine, and cover the cover after the wire wire of the test is passed through the spark motor box.
(2) work for the "crowding out" state, the breakdown to open about "non-stop" position, the power switch on the "open" position, the power indicator light, the high voltage start button, high light, clockwise "high pressure regulating knob", make the test voltage to the specified value, namely in test. If the wire has a breakdown, sound and light alarm, the operation should be marked at the breakdown point, uninterrupted test state.
(3) work as "rewind" state, the breakdown in the select button "stop" position, the power switch on the "open" position, the power indicator light, the high voltage start button, high light, clockwise "pressure adjustment knob, the test voltage to the provisions the value entered the test condition. The electric wire of the trial, such as the breakdown, the sound and light alarm, the high voltage output interruption, the equipment auto stop. After marking and processing at the breakdown, the operator reopened the equipment and the spark test machine to continue the test.
(4) when the tail end of the wire is near the spark test machine, the spark test machine should be cut off in time and the spark test machine cover is opened.
3. matters of attention
(1) the performance inspection must be done before the use of the power frequency spark test machine.
(2) before the use of the power frequency spark testing machine, it must be carefully checked whether the spark test machine and the wire and the conductor wire are reliably grounded.
(3) when used, it should be kept clean and dry in the electrode box.
(4) when the wire joint is passed through the spark test machine, the spark test machine cover should be opened and the joint is smooth as far as possible to prevent the damage of the spark test machine.